Getting Ready for the Foundation
Saturday the 14th of December was the first day
it was dry enough to work at the house site; exactly two weeks since we had
been able to work there. With yet another round of winter weather coming the
following weekend, we wanted to get the foundation in. We knew it would be a
lot of work to get everything ready but we were willing to try. We set the
cement company to arrive at 8 o’clock Wednesday morning the 18th.
Andrew started the form on Saturday and finally finished it
Monday, though we did brace it more on Tuesday. On the latter two days we were
working from sun up to past sun down. Tuesday Dad took the whole day off from
work to help get it all done, but with some usual hang ups with a job, we were
really cutting it close…..
| "I'm Digging to China!" |
| "I don't believe it's that far!" |
| "You sure? That's what it feels like! How many more of these!?!?" |
| "Ummm, let me see" |
As darkness fell the night before we were suppose to pour
the foundation, this is what it looked like. Trenches needed to be filled in,
Andrew needed to finish gluing the pipe, and the whole thing needed to be
graded and rebar put in. We were fully expecting the guys to be out working
till midnight. We so wished that it had dried out enough for us to start sooner
in preparing for the cement. Then things started to happen. Steve and Jeremy
Shetler arrived at about 4:30 to help; they helped us finish bracing the form
and helped Andrew with the plumbing. Right after the sun went down John and
Luke Nolt came over after they got home from a job. John asked Andrew if we
were pouring in the morning, Andrew told him yes at eight o’clock, when he
heard that immediately there was actionJ.
Some of the trenches were ready to be filled, within minutes shovels started
appearing and six guys where working away. Before we knew it lights had
appeared, more tools that we where needing, and yet another helper; Greg
Flokstra. He put the two lines of pex pipe in along with Steve and Dad’s help.
Standing there watching them I could hardly believe it. Within an hour five
guys (all from our church) appeared and went right to work, no one was standing
around and they were all working hard and fast! I so wanted to get a picture
but it was way too dark, it’ll always be in my mind though! Two were working on
plumbing, three were grading, and two were laying rebar out. Within four hours
everything was done! I was amazed, never before had I seen anything like it!
People showing up without being asked and then doing whatever it takes to get
the job done.
To all the guys a BIG
thank-you!! No one had to stay up half the night preparing everything, and the
cement was poured when we planned!!